Skip to content
MarineNutzOFFSHORE RIGGING · STUART, FL

TECH BULLETIN · CHARGING SYSTEMS

A BMS disconnect can leave an alternator with nowhere to send its output.

A lithium bank is not just a battery swap. The regulator, alternator, start battery, charge devices, bus, fuses, and BMS disconnect behavior all need to make sense together.

THE FAILURE PATH

Plan for the instant the bank disappears.

If a battery management system opens its contactor while an alternator is producing current, the sudden loss of load can create a damaging voltage transient. A design needs an engineered way to manage that event. A DC-DC charger is useful for setting a charge-current ceiling and separating chemistries, but it is not a universal alternator load-dump protector.

CHARGE LIMIT
Wakespeed regulator strategy or a suitably rated Victron DC-DC charger
BATTERY FEED
Class-T fuse selected for fault current and coordination, with high interrupt capacity
STANDARD
Design and installation reviewed against applicable ABYC E-11 and E-13 requirements

Trace every charging path.

List each alternator and charger, then draw where current flows with the engine running, the BMS closed, and the BMS open. Decide what sustains the alternator field or absorbs its output during a disconnect. Confirm regulator support for the alternator and battery arrangement; do not assume a generic “lithium mode” covers it.

20,000 AIC is not a magic label. High-interrupt capability matters because a lithium bank can deliver very high fault current. The fuse, holder, location, conductor, and system fault level must be considered together.

ABYC standards are updated and their application depends on the vessel and installation. We use the current applicable edition during a project and verify product instructions instead of treating a single diagram as a certification.

ASK ABOUT A CHARGE-SYSTEM REVIEW